June 19, 2019
-Eurofighter Jagdflugzeug GmbH, EUROJET Turbo GmbH and NETMA, the NATO Eurofighter & Tornado Management Agency, have signed contracts together worth €53.7 million to support the long-term development of the Eurofighter Typhoon combat aircraft.
The study contracts, which look at the Long Term Evolution (LTE) of the aircraft and the EJ200 engine, will span a total of 19 months for the aircraft and nine months for the engine elements.
The LTE study contracts will underpin the future of Eurofighter by identifying a suite of technology enhancements for the Weapons System infrastructure and the engine that will ensure the aircraft remains operationally effective and can continue to spearhead the Partner Nations’ air forces for the decades to come.
Herman Claesen, CEO of Eurofighter, said: “These contracts represent a significant step in shaping the future of Eurofighter and will ensure it continues to be one of the most important assets in the future operating environment.”
NETMA General Manager, General Salvestroni, said: “We are delighted to begin a new chapter in the development of the Eurofighter Typhoon. The LTE study contracts will set out a clear road map for the future of the platform that will make it relevant and resilient for decades to come.”
Andy Flynn, Typhoon Capability Delivery Director, BAE Systems – Air, said: “Typhoon is an aircraft designed to continuously evolve and today's announcement signals the next steps in realising its further potential.
“The LTE study contract backed by the strength of the Eurofighter partners will see Typhoon evolve to become the complete battlefield controller.”
The high technology areas being explored include:
Clemens Linden, CEO of EUROJET, said: “Together with further life extension measures and the development of a future maintenance strategy based on in-service experience, the LTE contracts are the first step towards ensuring that Eurofighter’s combat strength can be maintained and fully exploited throughout the first half of the 21st century.”
Source : BAE Systems PLC (LSE: BAES.L)
Publish date: January 2025 - Pages: 187